Step 1
Previous Preparation
It’s miles important to offer a properly compacted, strong base on which to begin the installation of interlocking pavers. In a few instances, this will require significant excavation of flawed sub-grade cloth. Prepare the web site via excavating the inspiration to allow for a beaten stone base to suit soil situations and meant use. All topsoil should be eliminated. Excavate all incorrect, volatile, or unconsolidated sub-grade fabric. While estimating the intensity of excavation, recall the final grade of the project.
Step 2
Leveling
The patio floor have to slope far from any structure. If possible, use crushed rock for the base, the identical material often used under roads. The climate and kind of soil beneath the base determines the thickness of this sediment. Bloodless regions with best clay or silt require a thicker base than well-drained soil in a heat climate.
Step 3
Create Sand Layer
Spread a good layer of sand. Make certain the floor of the sand is stage with the pinnacle of the concrete pad. Use the sand to get the surface as easy as possible. It’s far critical to maintain your sand dry. Constantly maintain your sand protected in case of rain.
Step 4
Lavel of Sand Layer
Screed the sand the use of a immediately board. Use a widespread 2×four that is 6 toes long. Make certain the board you operate is directly and true! The board can even help you maintain the slope so watch your string line. Do now not try to stage any area or surface irregularities with the sand bedding. This could bring about an choppy floor and unwanted settling.
Step 5
Established Blocks
From an established immediately line and a corner, begin laying the pavers inside the desired pattern. Keep straight lines by periodically stretching string traces parallel to and perpendicular to the original instantly aspect. Work off the laid stone and steadily lay each row until the complete region is paved. End the assignment by the use of a stone splitter or masonry saw to reduce pavers where wanted.
Step 6
Finishing with Sand
Using a brush, unfold sand over the patio and into the gaps among the pavers. Unfold over small regions earlier than transferring onto the subsequent one. Pass from side to side over the gaps until no extra sand will match. Once you have swept the sand into the paver joints, a hand tamp must be used over the entire paver area that allows you to “vibrate” the sand in addition into the joints. This tamping method will insure that the most quantity of sand is holding the pavers in area. (do no longer use a plate compacter to vibrate the pavers!) retain to add sand till the joints are complete.
Step 7
Vibrating Paving Machine for Finish
It’s miles crucial to ensure the floor of the pavers is clean! When you are executed spreading the sand into the gaps, use a leaf blower to blow the pleasant dust off the floor of your patio. Do no longer wash it off with water! That comes later. Sweep the place easy in preparation for tamping. The usage of a small mechanical tamper, gently tamp the entire region in each directions to bed down the pavers uniformly. Preserve to cowl with sand and vibrate until joints are complete and each paver is locked to its neighbor.